Letter of Invitation of Construction of the Baucau Municipal Capital Water Supply (Tender-RFB/053/MOP-2026)

Prośba o składanie wniosków

Informacja Ogólna

Timor-Leste
   Dili
   Tender-RFB/053/MOP-2026
   Cze 15, 2026
Lip 27, 2026
  
Comissão Nacional de Aprovisionamento (National Procurement Commission) (CNA)/The National Procurement Commission (NPC)
   2. The National Procurement Commission (NPC) on behalf of Ministry of Public Works (MOP) now invites sealed Bids from eligible Bidders. The Time for Completion shall be thirty (36) months from the Commencement Date. The scope of works includes, but is not limited to, the rehabilitation and upgrading of two (2) existing water sources including associated pumping systems; the development of two (2) new water sources including pumping systems and related facilities; the construction of one (1) tunnel of approximately 13 meters in length and two (2) vertical shafts of approximately 23 meters depth each; the construction of twelve (12) pumping stations complete with all civil, mechanical, electrical, and control systems; the supply and installation of approximately thirty-six (36) kilometers of raw water and treated water transmission mains; the construction of four (4) disinfection and water softening buildings including process equipment; the construction of eight (8) reinforced concrete ground water storage tanks and one (1) reinforced concrete elevated water tower tank; the supply and installation of approximately one hundred and four (104) kilometers of distribution network pipelines; and the construction and commissioning of approximately five thousand seven hundred (5,700) service connections. The Contractor shall coordinate closely with BTL and the Employer to minimize disruption to the existing water supply system and to support continued normal operation of water supply services to the city during construction. Any temporary works, bypass arrangements, phased construction, or shutdown mitigation measures required due to the Contractor’s activities shall be included in the Contractor’s scope and cost and shall be subject to prior approval and coordination with BTL and the Employer
   Angielski
   Przetarg międzynarodowy
   opublikowany: Cze 15, 2026

Informacje kontaktowe

   - -
Executive Director
National Procurement Commision
Avenida de Balide, Dili, Timor-Leste
-
-, - -
Timor-Leste
   +670 333 1101
   -
   Kliknij tutaj
   http://www.cna.gov.tl/ www.mof.gov.tl

Towary, prace i usługi

Konstrukcje i materiały budowlane; wyroby pomocnicze dla budownictwa Obsługa stacji wody

Additional resources

Oryginalny tekst


More information: Kliknij tutaj
Proszę zwróć uwagę że to ogłoszenie jest tylko dla twojej informacji.
Postaramy się o najdokładniejsze i najbardziej aktualne informacje dostępne na naszej stronie, ale nie możemy zagwarantować, że wszystkie dostarczone informacje są bezbłędne.
Jeśli masz jakiekolwiek sugestie mające na celu korektę tego ogłoszenia, proszę powiedz nam.