The Reason For This Valued Report Is The Replacement Of The Plasterboard Of The Walkways In The Main Room And Consists Of: - Dismantling And Removal Of The Existing Light Fixtures And Panels And Transport To An Authorized Landfill (Certificate Must Be Attached). - Sanitation - Supply And Placement Of New Panels, Leaving Them Ready So That The Successful Bidder For Lot 1 Of File 24-17 Can Install The New Lights. - The Awarded Company Must Carry Out The Work To Install The Scaffolding (Auxiliary Work,...) And Must Apply The Health And Safety Coordination Measures And The Tasks To Be Carried Out Will Be Carried Out By The Contractor, Following The Orders And Instructions Of Those Responsible For The Contract, And According To The Technical Prescriptions Included In The File. The New Panels To Be Supplied And Installed Must Have The Following Technical Documentation: - Declaration Of Eec Conformity Of All The Materials Supplied - Accreditation Of The Environmental Declaration Of The Products (Dap) According To Standards En 15804, Iso 14025 For Dap, Iso 14040 (Parts 1 And 2) And Iso 14044 Of The Supplied Materials.
Prośba o składanie wniosków
Postaramy się o najdokładniejsze i najbardziej aktualne informacje dostępne na naszej stronie, ale nie możemy zagwarantować, że wszystkie dostarczone informacje są bezbłędne.
Jeśli masz jakiekolwiek sugestie mające na celu korektę tego ogłoszenia, proszę powiedz nam.