Szukaj

In connection with the transformation of heating station No. 2 of the existing Lift Pump Station fed from the Baku Heat Electric Center into a modern type boiler house. Dismantling of the main cover and foundations of the district heating lines: asphalt concrete, with the help of breaker hammers, excavation of the soil with excavators with a capacity of 0.5 (0.5-0.63) m3 of Chalovu by loading it into dump trucks, soil group: 1 Depth 2 Manual digging of soil in sloped trenches up to m without fixings, soil group: 1 Excavation of soil with excavators with a bucket capacity of 0.5 (0.5-0.63) m3 by loading onto dump trucks, soil group: 1 Dump truck, 20 t transportation distance - 10 km. 1st class load. Making the foundation under pipelines: from sand

Prośba o składanie wniosków

Informacja Ogólna

   Lip 11, 2026
  
   Inne
   opublikowany: Lip 11, 2026

Oryginalny tekst

Ana səhifə Müsabiqə elanları Açıq tender (e-tender) Bakı İstilik Elektrik Mərkəzindən qidalanan mövcud Yüksəldici Nasos Stansiyası üzrə 2 saylı istilik məntəqəsinin müasir tipli qazanxanaya çevrilməsi ilə əlaqədar məhəllədaxili istilik xətlərinin əsasl Bakı İstilik Elektrik Mərkəzindən qidalanan mövcud Yüksəldici Nasos Stansiyası üzrə 2 saylı istilik məntəqəsinin müasir tipli qazanxanaya...
Opcje subskrypcji

Podstawowe

Pełne

Firmowe

550 USD/rok

1000 USD/rok

Koszt na żądanie

Kup Kup Kontakt z nami
Proszę zwróć uwagę że to ogłoszenie jest tylko dla twojej informacji.
Postaramy się o najdokładniejsze i najbardziej aktualne informacje dostępne na naszej stronie, ale nie możemy zagwarantować, że wszystkie dostarczone informacje są bezbłędne.
Jeśli masz jakiekolwiek sugestie mające na celu korektę tego ogłoszenia, proszę powiedz nam.